  {"id":106172,"date":"2015-06-03T05:01:40","date_gmt":"2015-06-03T09:01:40","guid":{"rendered":"http:\/\/www.rochester.edu\/newscenter\/?p=106172"},"modified":"2015-06-03T09:36:30","modified_gmt":"2015-06-03T13:36:30","slug":"preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall","status":"publish","type":"post","link":"https:\/\/www.rochester.edu\/newscenter\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\/","title":{"rendered":"Preliminary construction work to begin June 15 at site of new Wegmans Hall"},"content":{"rendered":"<p>Beginning June 15, University Campus Planning Design and Construction Management will begin work at the site of the future Wegmans Hall, which will be a 58,000 square-foot, four-story home to the Goergen Institute for Data Science.<\/p>\n<p>The new building will be located at the current midway point of Hutchison Rd., in between Hopeman and Hylan buildings. As part of the overall construction plan, Hutchison Rd. will no longer be a thoroughfare and will be permanently reduced to only provide access into the Wallis Hall parking lot and Dewey Parking Lot.<\/p>\n<p>Starting on June 15, Hutchison Road will officially close and the construction zone will be fenced off, creating the following impacts:<\/p>\n<ul>\n<li>Elimination of on-street parking on Hutchinson Rd.\u2014approximately four University businesses permit spaces. These business permit spaces will be relocated to Intercampus Drive lot effective June 15.<\/li>\n<li>Wallis Hall parking lot will remain open and accessible throughout construction. Dewey Lot, however, will not be accessible to vehicles for a period of 6 to 8 weeks, starting about June 29. This is to allow for underground utility work and Dewey Lot road modifications. All current parking in Dewey will be relocated \u2013 disability spaces to Meliora Lot, and business permits to Intercampus Drive Lot. The \u201c15-minute flasher\u201d spaces in Dewey will not be replaced, but drivers can use other similar locations throughout campus. A space on Wilson Boulevard will be designated as \u201c30-Minute Delivery Vehicle Drop-Off\u201d during this construction. Zone 1A permit holders may overflow to Intercampus Drive Lot during this construction. Dewey Lot is tentativelyscheduled to reopen on Aug. 15.<\/li>\n<li>Gavett lot will be modified this summer and will be closed for redesign and re-striping, effective Monday, June 15.\u00a0 Gavett parking permits will be accepted in the Intercampus Drive lot.\u00a0 The Gavett lot\u00a0is tentatively scheduled to reopen on Wednesday,\u00a0July 15.\u00a0\u00a0At that time, the lot will be reconfigured and will no longer be available as a through lot, but will dead-end at Taylor Hall.<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-106302 size-medium\" src=\"https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2015\/06\/vehicle-impacts-image1-630x513.png\" alt=\"graphic showing parking lots impacted by construction\" width=\"630\" height=\"513\" srcset=\"https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2015\/06\/vehicle-impacts-image1-630x513.png 630w, https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2015\/06\/vehicle-impacts-image1.png 768w\" sizes=\"auto, (max-width: 630px) 100vw, 630px\" \/><\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<ul>\n<li>East-west pedestrian walkways will be rerouted to avoid the construction zone, however all entrances to Hutchison Hall and Hylan Hall will remain open.<br \/>\n<img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-106312 size-medium\" src=\"https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2015\/06\/pedestrian-impacts-image1-630x528.png\" alt=\"north-south sidewalks to use during construction\" width=\"630\" height=\"528\" srcset=\"https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2015\/06\/pedestrian-impacts-image1-630x528.png 630w, https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2015\/06\/pedestrian-impacts-image1.png 762w\" sizes=\"auto, (max-width: 630px) 100vw, 630px\" \/><\/li>\n<\/ul>\n<p><br style=\"clear: both;\" \/><br \/>\nSee the University Parking website for additional notices for area permit holders: <a href=\"https:\/\/www.rochester.edu\/parking\/\">https:\/\/www.rochester.edu\/parking\/<\/a><\/p>\n<p>If you have any questions or concerns, please contact Greg Meyer, project manager, Campus Planning Design and Construction Management, 275-8068 or 275-0717.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The new building will be located at the current midway point of Hutchison Rd., in between Hopeman and Hylan buildings. As part of the overall construction plan, Hutchison Rd. will no longer be a thoroughfare and will be permanently reduced to only provide access into the Wallis Hall parking lot and Dewey Parking Lot.<\/p>\n","protected":false},"author":126,"featured_media":106212,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[3],"tags":[18612,25592],"class_list":["post-106172","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-university-news","tag-announcements","tag-goergen-institute-for-data-science-and-artificial-intelligence"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.5 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Preliminary construction work to begin June 15 at site of new Wegmans Hall<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.rochester.edu\/newscenter\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Preliminary construction work to begin June 15 at site of new Wegmans Hall\" \/>\n<meta property=\"og:description\" content=\"The new building will be located at the current midway point of Hutchison Rd., in between Hopeman and Hylan buildings. As part of the overall construction plan, Hutchison Rd. will no longer be a thoroughfare and will be permanently reduced to only provide access into the Wallis Hall parking lot and Dewey Parking Lot.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.rochester.edu\/newscenter\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\/\" \/>\n<meta property=\"og:site_name\" content=\"News Center\" \/>\n<meta property=\"article:published_time\" content=\"2015-06-03T09:01:40+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2015-06-03T13:36:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2015\/06\/vehicle-impacts-image-crop.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"935\" \/>\n\t<meta property=\"og:image:height\" content=\"561\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Sara Miller\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Sara Miller\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\\\/\"},\"author\":{\"name\":\"Sara Miller\",\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/#\\\/schema\\\/person\\\/27e096963bc860db530195ce8e8547f7\"},\"headline\":\"Preliminary construction work to begin June 15 at site of new Wegmans Hall\",\"datePublished\":\"2015-06-03T09:01:40+00:00\",\"dateModified\":\"2015-06-03T13:36:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\\\/\"},\"wordCount\":391,\"image\":{\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/wp-content\\\/uploads\\\/2015\\\/06\\\/vehicle-impacts-image-crop.jpg\",\"keywords\":[\"announcements\",\"Goergen Institute for Data Science and Artificial Intelligence\"],\"articleSection\":[\"University News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\\\/\",\"url\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\\\/\",\"name\":\"Preliminary construction work to begin June 15 at site of new Wegmans Hall\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/wp-content\\\/uploads\\\/2015\\\/06\\\/vehicle-impacts-image-crop.jpg\",\"datePublished\":\"2015-06-03T09:01:40+00:00\",\"dateModified\":\"2015-06-03T13:36:30+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/#\\\/schema\\\/person\\\/27e096963bc860db530195ce8e8547f7\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/wp-content\\\/uploads\\\/2015\\\/06\\\/vehicle-impacts-image-crop.jpg\",\"contentUrl\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/wp-content\\\/uploads\\\/2015\\\/06\\\/vehicle-impacts-image-crop.jpg\",\"width\":935,\"height\":561,\"caption\":\"map showing location of new building\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Preliminary construction work to begin June 15 at site of new Wegmans Hall\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/#website\",\"url\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/\",\"name\":\"News Center\",\"description\":\"Ä¢¹½´«Ã½\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/#\\\/schema\\\/person\\\/27e096963bc860db530195ce8e8547f7\",\"name\":\"Sara Miller\",\"url\":\"https:\\\/\\\/www.rochester.edu\\\/newscenter\\\/author\\\/smiller\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Preliminary construction work to begin June 15 at site of new Wegmans Hall","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.rochester.edu\/newscenter\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\/","og_locale":"en_US","og_type":"article","og_title":"Preliminary construction work to begin June 15 at site of new Wegmans Hall","og_description":"The new building will be located at the current midway point of Hutchison Rd., in between Hopeman and Hylan buildings. As part of the overall construction plan, Hutchison Rd. will no longer be a thoroughfare and will be permanently reduced to only provide access into the Wallis Hall parking lot and Dewey Parking Lot.","og_url":"https:\/\/www.rochester.edu\/newscenter\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\/","og_site_name":"News Center","article_published_time":"2015-06-03T09:01:40+00:00","article_modified_time":"2015-06-03T13:36:30+00:00","og_image":[{"url":"https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2015\/06\/vehicle-impacts-image-crop.jpg","width":935,"height":561,"type":"image\/jpeg"}],"author":"Sara Miller","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Sara Miller","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.rochester.edu\/newscenter\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\/#article","isPartOf":{"@id":"https:\/\/www.rochester.edu\/newscenter\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\/"},"author":{"name":"Sara Miller","@id":"https:\/\/www.rochester.edu\/newscenter\/#\/schema\/person\/27e096963bc860db530195ce8e8547f7"},"headline":"Preliminary construction work to begin June 15 at site of new Wegmans Hall","datePublished":"2015-06-03T09:01:40+00:00","dateModified":"2015-06-03T13:36:30+00:00","mainEntityOfPage":{"@id":"https:\/\/www.rochester.edu\/newscenter\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\/"},"wordCount":391,"image":{"@id":"https:\/\/www.rochester.edu\/newscenter\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\/#primaryimage"},"thumbnailUrl":"https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2015\/06\/vehicle-impacts-image-crop.jpg","keywords":["announcements","Goergen Institute for Data Science and Artificial Intelligence"],"articleSection":["University News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.rochester.edu\/newscenter\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\/","url":"https:\/\/www.rochester.edu\/newscenter\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\/","name":"Preliminary construction work to begin June 15 at site of new Wegmans Hall","isPartOf":{"@id":"https:\/\/www.rochester.edu\/newscenter\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.rochester.edu\/newscenter\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\/#primaryimage"},"image":{"@id":"https:\/\/www.rochester.edu\/newscenter\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\/#primaryimage"},"thumbnailUrl":"https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2015\/06\/vehicle-impacts-image-crop.jpg","datePublished":"2015-06-03T09:01:40+00:00","dateModified":"2015-06-03T13:36:30+00:00","author":{"@id":"https:\/\/www.rochester.edu\/newscenter\/#\/schema\/person\/27e096963bc860db530195ce8e8547f7"},"breadcrumb":{"@id":"https:\/\/www.rochester.edu\/newscenter\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.rochester.edu\/newscenter\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.rochester.edu\/newscenter\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\/#primaryimage","url":"https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2015\/06\/vehicle-impacts-image-crop.jpg","contentUrl":"https:\/\/www.rochester.edu\/newscenter\/wp-content\/uploads\/2015\/06\/vehicle-impacts-image-crop.jpg","width":935,"height":561,"caption":"map showing location of new building"},{"@type":"BreadcrumbList","@id":"https:\/\/www.rochester.edu\/newscenter\/preliminary-construction-work-to-begin-june-15-at-site-of-new-wegmans-hall\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.rochester.edu\/newscenter\/"},{"@type":"ListItem","position":2,"name":"Preliminary construction work to begin June 15 at site of new Wegmans Hall"}]},{"@type":"WebSite","@id":"https:\/\/www.rochester.edu\/newscenter\/#website","url":"https:\/\/www.rochester.edu\/newscenter\/","name":"News Center","description":"Ä¢¹½´«Ã½","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.rochester.edu\/newscenter\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.rochester.edu\/newscenter\/#\/schema\/person\/27e096963bc860db530195ce8e8547f7","name":"Sara Miller","url":"https:\/\/www.rochester.edu\/newscenter\/author\/smiller\/"}]}},"_links":{"self":[{"href":"https:\/\/www.rochester.edu\/newscenter\/wp-json\/wp\/v2\/posts\/106172","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.rochester.edu\/newscenter\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.rochester.edu\/newscenter\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.rochester.edu\/newscenter\/wp-json\/wp\/v2\/users\/126"}],"replies":[{"embeddable":true,"href":"https:\/\/www.rochester.edu\/newscenter\/wp-json\/wp\/v2\/comments?post=106172"}],"version-history":[{"count":2,"href":"https:\/\/www.rochester.edu\/newscenter\/wp-json\/wp\/v2\/posts\/106172\/revisions"}],"predecessor-version":[{"id":106322,"href":"https:\/\/www.rochester.edu\/newscenter\/wp-json\/wp\/v2\/posts\/106172\/revisions\/106322"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.rochester.edu\/newscenter\/wp-json\/wp\/v2\/media\/106212"}],"wp:attachment":[{"href":"https:\/\/www.rochester.edu\/newscenter\/wp-json\/wp\/v2\/media?parent=106172"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.rochester.edu\/newscenter\/wp-json\/wp\/v2\/categories?post=106172"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.rochester.edu\/newscenter\/wp-json\/wp\/v2\/tags?post=106172"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}